-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueIPC APEX EXPO 2024 Pre-show
This month’s issue devotes its pages to a comprehensive preview of the IPC APEX EXPO 2024 event. Whether your role is technical or business, if you're new-to-the-industry or seasoned veteran, you'll find value throughout this program.
Boost Your Sales
Every part of your business can be evaluated as a process, including your sales funnel. Optimizing your selling process requires a coordinated effort between marketing and sales. In this issue, industry experts in marketing and sales offer their best advice on how to boost your sales efforts.
The Cost of Rework
In this issue, we investigate rework's current state of the art. What are the root causes and how are they resolved? What is the financial impact of rework, and is it possible to eliminate it entirely without sacrificing your yields?
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - smt007 Magazine
Mining for Metals Requires a Long View
June 15, 2022 | Nolan Johnson, I-Connect007Estimated reading time: 3 minutes
Nolan Johnson talks with Shaun Dykes, a 50-year expert in the mining industry. Dykes gives a concise primer on mining development, and the amount of time and effort required to develop and supply the mineral resources we depend upon for the manufacture of printed circuit boards. There are many factors that play into when and where a mine is developed—and what can prevent a mine from ever producing minerals.
Nolan Johnson: Shaun, what is your specific role and your background?
Shaun Dykes: I’m the president and CEO at American CuMO Mining Corp., and an engineer and geologist by background. I’ve been in the business for almost 50 years. I’ve been all over the world, looking at and worked on deposits in different regimes, governments, and bureaucracies from Canada, U.S., and Australia. I spent time in Russia and South America as well.
Johnson: Minerals and their role in the supply chain for finished metals has a great impact on my readers. They rely on the copper, tin, lead, and all the metals that go onto those fiberglass boards. In addition, there’s solder and the minerals involved in those formulations. Copper, of course, plays a central role; that seems to be a metal at the core of the dynamics going on.
What are some of the global supply and demand trends in your industry and how might that be affecting us in electronics manufacturing?
Dykes: Metals, especially now with all the new technologies, are appearing everywhere—your circuitry, desalination plants, batteries, even your drinking water. Every single metal is in strong demand. The supply is getting shorter and shorter, and as mines become older, the grades are dropping and that reduces the amount of metal available. It now takes about five times longer to permit a mine than it used to because of the new regulations and rules you must go through.
Even then, some mines just can’t go into production because they’re either too costly or the opposition is too strong, and you can’t get the permits to proceed. Right now, the supply is far less than the demand. Of course, that demand is increasing on a steady basis, year in, year out. That’s why you’re seeing the increase in metal prices.
Johnson: It sounds to me like any sort of domestic mining is under even stricter regulation, even while the demand is going up.
Dykes: Definitely. What we go through in the mining industry—some of it’s good, while some is red tape and just absolute garbage. But other parts are good for the environment to make sure that the old days of mining, where you just rape and pillage with no care for what was going on, is long gone. Now, when we look at developing new mines, one of the first things we look at is the environment—rare and endangered species, trees, and more, before we even start spending the hundreds of millions of dollars it takes to develop a mine.
Johnson: Hundreds of millions of dollars to develop a mine? In our space, to build a computer chip factory, a semiconductor factory, is hundreds of millions of dollars and four or five years before it’s producing. Is it comparable with a mine? If you decide to go forward, how quickly can you get a mine up and running?
Dykes: Well, it depends. From first boots on the ground, you’ve got to drill it and explore; for the larger scale mines, like the ones that supply your metals, it’s averaging close to 20 years.
Johnson: Twenty years to get a mine started?
Dykes: From when you’ve discovered and outlined it, and let’s say you’ve got all your resources and a bankable feasibility study, it’s probably two to four years to construct it. Your construction costs can range from a couple hundred million dollars for the small mines up to several billion dollars for the large scale. A large-scale copper mine today will cost $2 billion to $3 billion, maybe even more. We’ve been working on a mine in Idaho since 2004. We still have about two years to go on the economic analysis part and then it will be three or four years to build it. The cost to build it is anywhere from $1 billion to $3 billion.
To read the rest of this article, which appeared in the June 2022 issue of SMT007 Magazine, click here.
Suggested Items
Indium Corporation to Present, Exhibit at EPP InnovationsFORUM
03/28/2024 | Indium CorporationIndium Corporation is set to present and exhibit at EPP InnovationsFORUM, one of Europe’s premier single-day electronics manufacturing forums, on April 17 in Leinfelden-Echterdingen, Germany. Topic areas for 2024 will include AI, automation, sustainability, and quality.
Reducing Nitrogen Consumption in Convection Soldering with Rehm Thermal Systems' Patented Mechatronic Curtain
03/28/2024 | Rehm Thermal SystemsCurrent developments indicate a need for larger throughput heights due to the trend towards e-mobility, which in turn increases nitrogen consumption for process inertization. Rehm Thermal Systems responds to this issue with an innovative solution: the mechatronic curtain.
Indium Corporation, Industry Partners to Showcase Products “Live@APEX”
03/26/2024 | Indium CorporationIndium Corporation®, in cooperation with its industry partners, will feature its proven solder solutions live on the show floor throughout IPC APEX Expo from Apr. 9‒11 in Anaheim, Calif., U.S.
ITW EAE Wins New Product Introduction Award for Electrovert® Wave Soldering Machine Deep Wave
03/26/2024 | ITW EAEITW EAE is proud to announce that it has earned a 2024 New Product Introduction (NPI) Award for Electrovert’s Deep Wave option for wave soldering machines. This new, innovative system provides the ability to pump up to a 20 mm wave height.
Mek's Next-Gen AOI Technology Takes Center Stage at IPC APEX EXPO 2024
03/19/2024 | MEKMek is excited to announce its presence at IPC APEX EXPO, North America's largest electronics manufacturing event, in Anaheim, California, from April 6-11, 2024. Attendees are invited to visit Mek at booth #1433 to explore the latest AOI technology offerings.